Page 2 of 7

Re: Dave's 2nd Build: A KMG J-200

Posted: Mon Sep 17, 2012 9:29 pm
by TonyinNYC
That spruce top is about as nice as they come. Nice work so far!

Re: Dave's 2nd Build: A KMG J-200

Posted: Wed Sep 19, 2012 6:29 pm
by Dennis in Anola
Cut it out Dave. I'm starting to get GAS. Fabulous! I'll watch this build real close.

Re: Dave's 2nd Build: A KMG J-200

Posted: Thu Sep 20, 2012 12:33 am
by Ken Hundley
Gorgeous work so far, keep it up!

Re: Dave's 2nd Build: A KMG J-200

Posted: Thu Oct 18, 2012 9:51 pm
by dave d
I don't know where the last month has gone since I posted the previous photos, but my progress hasn't been stellar.

Anyway, here we go. It's time to prepare the top for the bracing and subsequent gluing to the rim.
The x-brace is notched and placed on the pencil lines.  Note that on the J200, the lower ends of the x-brace don't go into the kerfing.
The x-brace is notched and placed on the pencil lines. Note that on the J200, the lower ends of the x-brace don't go into the kerfing.
DBD_6333.JPG (296.11 KiB) Viewed 865 times
The X-brace is clamped while the bridge reinforcing piece is glued.
The X-brace is clamped while the bridge reinforcing piece is glued.
DBD_6337.JPG (345.45 KiB) Viewed 865 times
Gluing one leg of the x-brace on at a time.
Gluing one leg of the x-brace on at a time.
DBD_6340.JPG (326.85 KiB) Viewed 865 times
Fast forward to the point where some more bracing is glued on, but not fully carved/scalloped yet.
Fast forward to the point where some more bracing is glued on, but not fully carved/scalloped yet.
DBD_6373.JPG (452.78 KiB) Viewed 865 times
Ready for gluing the top to the rim.
Ready for gluing the top to the rim.
DBD_6426.JPG (292.28 KiB) Viewed 865 times
More to come...

Re: Dave's 2nd Build: A KMG J-200

Posted: Thu Oct 18, 2012 10:12 pm
by dave d
And on to the back bracing.
Preparing the reinforcing strips that go down the centre of the back.
Preparing the reinforcing strips that go down the centre of the back.
DBD_6325.JPG (326.16 KiB) Viewed 862 times
Don't forget to use the clamping caul when gluing!
Don't forget to use the clamping caul when gluing!
DBD_6326.JPG (344.74 KiB) Viewed 862 times
There's some pretty nice glue squeeze-out along the edge of the brace with just one clamp.  You can see that Ken's 3x5 cards are being utilized to create the 15' radius.
There's some pretty nice glue squeeze-out along the edge of the brace with just one clamp. You can see that Ken's 3x5 cards are being utilized to create the 15' radius.
DBD_6443.JPG (311.74 KiB) Viewed 862 times
With the rim and top and back at this stage, I'm ready for notching the kerfing for the braces.
With the rim and top and back at this stage, I'm ready for notching the kerfing for the braces.
DBD_6446.JPG (330.97 KiB) Viewed 862 times

Re: Dave's 2nd Build: A KMG J-200

Posted: Thu Oct 18, 2012 10:33 pm
by dave d
Gluing on the top!
With the top held in place with a few elastic bands, the locations of the shoulder brace and top of the x-brace are marked on the rim.  (For other guitar models, the lower x-brace would be marked too.)
With the top held in place with a few elastic bands, the locations of the shoulder brace and top of the x-brace are marked on the rim. (For other guitar models, the lower x-brace would be marked too.)
DBD_6450.JPG (320.38 KiB) Viewed 862 times
The depth of the notch (and height of the braces) needs to be less than the binding width minus the thickness of the soundboard. The binding is closer to .25" but the micrometer was slipping around as I took the picture.
The depth of the notch (and height of the braces) needs to be less than the binding width minus the thickness of the soundboard. The binding is closer to .25" but the micrometer was slipping around as I took the picture.
DBD_6455.JPG (235.92 KiB) Viewed 862 times
The thickness of the soundboard.
The thickness of the soundboard.
DBD_6456.JPG (212.72 KiB) Viewed 862 times
This is where the popsicle stick can be used as a measuring guide. Mark the notch on the kerfing (looks untidy but I know which lines to cut on) :) and then use the razor saw/box cutter/chisel/potato peeler/lie-nielsen marking knife or whatever works for you to carefully cut out the notch.
This is where the popsicle stick can be used as a measuring guide. Mark the notch on the kerfing (looks untidy but I know which lines to cut on) :) and then use the razor saw/box cutter/chisel/potato peeler/lie-nielsen marking knife or whatever works for you to carefully cut out the notch.
DBD_6460.JPG (231.16 KiB) Viewed 862 times
With the top placed on the rim again for a trial run, there is no gap, all the way around the edge where the two surfaces meet.  Patience comes in to play here if it doesn't. Just gradually tweak the notch or brace where you need to. Yes, I should have taken a photo where a brace is actually visible sticking through!
With the top placed on the rim again for a trial run, there is no gap, all the way around the edge where the two surfaces meet. Patience comes in to play here if it doesn't. Just gradually tweak the notch or brace where you need to. Yes, I should have taken a photo where a brace is actually visible sticking through!
DBD_6467.JPG (168.45 KiB) Viewed 862 times
Voila. The top has been glued and the overhang trimmed off.  I use a Bosch Colt laminate trimmer/router, and take several passes to be careful that I don't get tear-out.  Using the right router bit makes a big difference. A spiral downcut bit with a bearing works great.
Voila. The top has been glued and the overhang trimmed off. I use a Bosch Colt laminate trimmer/router, and take several passes to be careful that I don't get tear-out. Using the right router bit makes a big difference. A spiral downcut bit with a bearing works great.
DBD_6472.JPG (315.93 KiB) Viewed 862 times
Note: The lower bout looks as big in person as it does in the picture. :)

Re: Dave's 2nd Build: A KMG J-200

Posted: Thu Oct 18, 2012 11:18 pm
by Dave Bagwill
Nice!
What kind of kerfing is that?