Dave's 2nd Build: A KMG J-200

Show us how your current project is progressing
Post Reply
dave d
Posts: 451
Joined: Sun Jan 01, 2012 11:05 pm
Location: Toronto-ish

Dave's 2nd Build: A KMG J-200

Post by dave d » Thu Sep 13, 2012 9:55 pm

Hello all!
In the summer I decided it was time to order another of Ken's great kits, this time the Gibson J-200.
I've loved the shape of the J-200 ever since I held one back in the day, and a friend took this photo of me:
I've loved the shape of the J-200 ever since I held one back in the day, and a friend took this photo of me:
EP_J200.jpg (38.45 KiB) Viewed 1804 times
Okay, so it isn't really me, but hopefully my guitar, once complete, will look similar to that one.

I received the kit about 2 weeks ago, and here's a few photos of the box contents, all very nicely packaged for shipping.
A great looking neck, back , sides, and top!
A great looking neck, back , sides, and top!
2012-09-08.jpg (59.25 KiB) Viewed 1777 times
And the rest of the components:
And the rest of the components:
2012-09-081.jpg (56.6 KiB) Viewed 1777 times

Wow - I should have such a nice mustache.

So stay tuned, more pics to come as I progress. And for those of you who I will pester frequently with questions that will cause you to grimace, I apologize in advance and thank you for your patience. Again.

dave d
Posts: 451
Joined: Sun Jan 01, 2012 11:05 pm
Location: Toronto-ish

Re: Dave's 2nd Build: A KMG J-200

Post by dave d » Sun Sep 16, 2012 10:42 pm

Hi again...

Here are some photos of what I've done so far.
After the mold has been set up with the template, I mark the sides at the centre line for cutting.
After the mold has been set up with the template, I mark the sides at the centre line for cutting.
DBD_6052.JPG (100.68 KiB) Viewed 1772 times
Sides now cut to length.
Sides now cut to length.
DBD_6056.JPG (91.28 KiB) Viewed 1772 times
Gluing the neck block and tail block.
Gluing the neck block and tail block.
DBD_6076.JPG (70.36 KiB) Viewed 1772 times
Wetting the kerfing and temporarily clamping it to the outside of the rim for ease of gluing to the inside later.
Wetting the kerfing and temporarily clamping it to the outside of the rim for ease of gluing to the inside later.
DBD_6082.JPG (89.45 KiB) Viewed 1772 times
Gluing on the kerfing.
Gluing on the kerfing.
DBD_6088.JPG (112.55 KiB) Viewed 1772 times
Top kerfing done.
Top kerfing done.
DBD_6092.JPG (62.33 KiB) Viewed 1772 times
and the bottom kerfing is on.
and the bottom kerfing is on.
DBD_6106.JPG (100.86 KiB) Viewed 1772 times
Profiling the upper bout of the top edge.
Profiling the upper bout of the top edge.
DBD_6127.JPG (72.9 KiB) Viewed 1772 times
Preparing the bottom for contouring by marking the neck and tail blocks.
Preparing the bottom for contouring by marking the neck and tail blocks.
DBD_6128.JPG (89.67 KiB) Viewed 1772 times
Using a plane to trim most of the excess block.
Using a plane to trim most of the excess block.
DBD_6135.JPG (70.25 KiB) Viewed 1772 times
To be continued...

dave d
Posts: 451
Joined: Sun Jan 01, 2012 11:05 pm
Location: Toronto-ish

Re: Dave's 2nd Build: A KMG J-200

Post by dave d » Sun Sep 16, 2012 10:50 pm

More...
Rim edge and neck block after using the rotating radius bar.
Rim edge and neck block after using the rotating radius bar.
DBD_6146.JPG (51.92 KiB) Viewed 1772 times
Checking the fit of the abalone rosette
Checking the fit of the abalone rosette
DBD_6193.JPG (85.13 KiB) Viewed 1772 times
remove the abalone and purfling strips, and then seal the channel with lacquer. Once dry, replace the pieces and flood with CA.
remove the abalone and purfling strips, and then seal the channel with lacquer. Once dry, replace the pieces and flood with CA.
DBD_6195.JPG (89.88 KiB) Viewed 1772 times
Time for some scraping and sanding
Time for some scraping and sanding
DBD_6205.JPG (111.59 KiB) Viewed 1772 times
Rosette looking pretty good!
Rosette looking pretty good!
2012-09-16.jpg (159.48 KiB) Viewed 1772 times


Time to get some sleep...

Dave Bagwill
Posts: 5951
Joined: Tue Dec 13, 2011 7:44 pm

Re: Dave's 2nd Build: A KMG J-200

Post by Dave Bagwill » Sun Sep 16, 2012 11:00 pm

This is fun to follow, Dave, thanks for posting!
-Under permanent construction

ken cierp
Posts: 3924
Joined: Tue Dec 13, 2011 11:23 pm

Re: Dave's 2nd Build: A KMG J-200

Post by ken cierp » Mon Sep 17, 2012 8:14 am

Excellent documentation -- premo photography !!!

Kevin in California
Posts: 2799
Joined: Mon Dec 19, 2011 4:19 pm

Re: Dave's 2nd Build: A KMG J-200

Post by Kevin in California » Mon Sep 17, 2012 9:54 am

Bee Ute IFUL work so far.
Keep the pics coming.

Kevin

Tim Benware
Posts: 1489
Joined: Thu Dec 22, 2011 1:22 pm
Location: Asheboro, NC

Re: Dave's 2nd Build: A KMG J-200

Post by Tim Benware » Mon Sep 17, 2012 9:57 am

Yes, very good keep it going.
I've "Ben-Had" again!
Tim Benware
Creedmoor, NC

Post Reply