KMG 000 First Build
Re: KMG 000 First Build
Decided to rout in a backstrip. Very carefully.
- Attachments
-
- Measure. Measure. Measure.
- image.jpg (143.17 KiB) Viewed 699 times
-
- Nice clean channel after a couple of passes.
- image.jpg (94.72 KiB) Viewed 699 times
-
- Need to shave it down.
- image.jpg (108.03 KiB) Viewed 699 times
JJ
Learning every day. And having fun doing it.
Learning every day. And having fun doing it.
Re: KMG 000 First Build
Back braces glued up. Contouring and thinning at the rim.
- Attachments
-
- Fitting back braces
- image.jpg (132.02 KiB) Viewed 689 times
-
- Thickness jig.
- image.jpg (98.13 KiB) Viewed 689 times
-
- image.jpg (82.07 KiB) Viewed 689 times
JJ
Learning every day. And having fun doing it.
Learning every day. And having fun doing it.
Re: KMG 000 First Build
Back glued up and trimmed. Tail wedge next.
- Attachments
-
- image.jpg (124.78 KiB) Viewed 672 times
JJ
Learning every day. And having fun doing it.
Learning every day. And having fun doing it.
Re: KMG 000 First Build
Looking good - love that back strip.
Re: KMG 000 First Build
Got the tail wedge done. Have been prepping the sides for the dreaded binding step.
- Attachments
-
- I like the way this turned out.
- image.jpg (135.86 KiB) Viewed 649 times
JJ
Learning every day. And having fun doing it.
Learning every day. And having fun doing it.
Re: KMG 000 First Build
I decided to take a little detour before routing the body for bindings.
- Attachments
-
- image.jpg (217.77 KiB) Viewed 626 times
-
- image.jpg (217.77 KiB) Viewed 626 times
JJ
Learning every day. And having fun doing it.
Learning every day. And having fun doing it.
-
- Posts: 2749
- Joined: Fri Dec 23, 2011 8:33 pm
- Location: Seattle
- Contact:
Re: KMG 000 First Build
Those inlay look good. On to the bindings!